Load application
Spacing disc
Set the overload stop during
installation and cement with screw
locking adhesive
Fig.3.1:
Load application and installation
Important
Load must not be applied to the side where the cable connection is located,
as this would cause a force shunt through the cable.
Setting the overload stop:
Type PW29 load cells are fitted with an adjustable overload stop. Set this
overload stop before starting up the load cell.
To do this, load the installed load cell with approx. 120% of the service load, at
the maximum eccentricity for the particular application. The maximum per-
missible loadings stated in the specifications must not be exceeded. Note in
particular the "Limit load at max. 100 mm eccentricity" specification, and take
into consideration the moment produced by the eccentricity in your individual
application. Then adjust the screw of the overload stop and fix it in position
with a screw locking adhesive, such as Loctite.
HBM
Direction of loading center of platform
Spacing disc
PW29
Connection
cable
Mounting
A3313-1.0 en/de/fr
0