Operation; Commissioning; Description Of Pictograms - Atlantic CALYPSO VM Notice D'utilisation Et D'installation

Chauffe-eau thermodynamique mural
Masquer les pouces Voir aussi pour CALYPSO VM:
Table des Matières

Publicité

Overview

1. Commissioning

1.1. Filling of the tank
Open one or several hot water taps.
Open the cold water tap on the security group (make sure that the drain valve is closed).
When water starts flowing from the hot water taps close them. The tank is full.
Check the connections for possible leaks.
Check the correct function of valves and safety group by opening them several times in order to eliminate
possible particles.
10.2. First operation
If the water heater has been tilted wait for minimum 1h before operation.
Access to mode
and settings
Confirm
Increase of hot water
production

2. Description of pictograms.

Consigne eau chaude
Fast heating confirmed
Absence registered / in operation
Reception of signal on photovoltaic
Installation

Operation

Operation
MANUAL
BOOST
Maintenance
Electric backup working
Heat pump working
Anti-legionella heating cycle
Waiting
43
Warranty
Check the information
Follow the instructions
Navigate
Increase the values
Return to previous screen
Navigate
Reduce the values

Publicité

Table des Matières
loading

Table des Matières