Checklist For Commissioning / Inspection (1) And Maintenance (2); Checklist For Commissioning Sanifos - SFA SANIFOS 110 Notice D'installation

Masquer les pouces Voir aussi pour SANIFOS 110:
Table des Matières

Publicité

Clogged ventilation port
Risk that the pumping station will not work
➜ Check the ventilation piping regularly. The passage should never be blocked.El paso no debe estar taponado nunca.
NOTE:
Setting up a maintenance plan avoids costly repairs, minimizes maintenance work and achieves correct and reliable
operation.
9. CHECKLIST FOR COMMISSIONING/
INSPECTION (1) AND MAINTENANCE (2)
9.1 Checklist for commissioning SANIFOS pumping stations
• Check that the system is switched off.
• Unscrew the cover (SANIFOS
• Check that the tank is level
• Check that there is no deformation, crushing or cracking of the tank
• Check the internal cleanliness of the tank (no soil, no sand...)
• Check the tightness of the valve connections
• Check that the discharge diameter is appropriate for the installation
• Check that the installation location of the SANIFOS station
FEA makes it possible to have the cover of the tank at the level of the ground)
• Check the tightness of the clamps of the inlet and outlet connections
• Check the presence of the tank ventilation (diameter 75). Air must flow in both directions.
• Check the tightness of the electrical casing (underground tank) or the glands (floor-standing tank)
• Check that the voltage and frequency of the power supply correspond to those indicated on the rating plate of the appliance
• Check the size of the power supply cable (3G 1.5 mm²) / (5G2.5 mm²) for three-phase versions
• Check that the power supply circuit is earthed and protected by a 30 mA differential circuit breaker
• Check that the power cable is not damaged
• Check that the connection is only used for the power supply of the pumping station
• Check that the connectors are in the correct locations
• Check the tightness of the waterproof connectors (SANIFOS
• Screw the cover (SANIFOS
®
• Switch the system back on
• Carrying out some pump operation tests (switching on / off) using each sanitary fixture connected to the pump
• Check the alternating operation of the pumps (on SANIFOS
• Check the freedom of movement of the float(s)
• Check for the correct functioning of the non-return valve
• Check the general sealing and tighten the connections if necessary.
• Check the correct functioning and ease of operation of the shut-off valves
• Check the flow at the discharge outlet
Power-on checks to be performed on the SMART unit
• Set the language, date and time
• Define the use of the station: Industrial, small collective or domestic
• Check that the quick connectors are correctly connected to the SMART unit
• Check that the lights on both pumps are green
• Check the power supply voltage
• Check that the motors are operating correctly
• Check that the forced current is between 4 and 6 A in single-phase / between 4 and 7A in three-phase
• Check that the remote alarm box is switched on
• Check that the level of water in the tank at the end of the cycle is at +/- 10 cm from the bottom of the tank
• Set the delay time accordingly
• Check that the data has been correctly recorded by the SMART box (log, pumping time...)
9.2 Checklist for commissioning SANIFOS pumping stations
Any maintenance performed on the SANIFOS pumping station
It is advisable for the user of the SANIFOS
If this is not the case, contact the SFA technical service for any maintenance work on the SANIFOS pumping station
110) or the cover bolts (SANIFOS
®
110) or the cover bolts (SANIFOS
pumping station to enter into a maintenance contract at the time of commissioning.
®
®
250 and SANIFOS
500)
®
®
respects a slope of gravity discharge of the effluents to the tank (and that the
®
250 and SANIFOS
500)
®
®
250 and SANIFOS
500)
®
®
500)
®
®
must be carried out by qualified personnel.
®
UK
.
®
137

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sanifos 250Sanifos 500

Table des Matières