Hach astroTOC UV 4195-1010 Manuel D'utilisation page 22

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Startup
Reagent preparation
Chemical exposure hazard. Obey laboratory safety procedures and wear all of the personal protective
equipment appropriate to the chemicals that are handled. Refer to the current safety data sheets
(MSDS/SDS) for safety protocols.
Plumb the reagent solutions
Install the reagent solutions as shown in
Figure 14 Reagent connections
1 Tubing assembly (4 L)
2 Tubing assembly (19 L)
Turn on the analyzer
Turn on the main AC power to the analyzer.
After a purge, the pumps and UV lamps turn on and the IR detector increases to operating
temperature. The analyzer goes online when the IR detector is at operating temperature (50 °C).
After a loss of power or a software reboot, the analyzer turns on and a purge is done before the
analyzer goes online. To skip the purge, push ENTER.
Start-up checks
1. When the display shows "Purging", make sure that the analyzer has the correct range for the
intended application.
2. Make sure that the sample inlet line(s) is in the zero standard container.
3. Let the analyzer operate for 30 minutes.
4. Look for any leaks in the analyzer. Fix all leaks.
22 English
W A R N I N G
Figure
14.
3 Span solution
4 Zero solution
5 Persulfate solution
6 Acid solution

Publicité

Table des Matières
loading

Table des Matières