Hitachi CH-UNIT CH-4.0NE Manuel D'installation Et De Fonctionnement page 10

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 55
4
STRUCTURE
2.2.2. CH Unit – CH-12.0N
To Indoor Unit
High
Pressure
Gas Line
Low
Pressure
Gas Line
Refrigerant Flow Direction (Cooling Operation)
Refrigerant Flow Direction (Heating Operation)
No
Description
1
Solenoid Valve (AC)
2
Strainer
3
Check Valve
4
Capillary Tube
5
Capillary Tube
NOTE:
The mark of inside "[ ]" is shown in the electrical wiring diagram.
To Outdoor Unit
Flare Connection
Flange Connection
Brazing Connection
Field Refrigerant Piping
Material Size
Mark
O.D.(mm) × thickness (mm)
∅6.35 x 1.07
a
∅12.7 x 1.0
b
∅15.88 x 1.0
c
∅15.88 x 1.2
d
∅19.05 x 1.2
e
∅19.05 x 1.65
f
∅3.0 x 0.8
g
∅4.0 x 0.5
h
∅22.2
j
∅19.05
k
High Pressure
Gas Line
Low
Pressure
Gas Line
Low
Pressure
Gas Line
Material
Copper Tube
C1220T-O

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ch-unit ch-8.0neCh-unit ch-12.0nCh-unit sérieCh-4.0neCh-8.0neCh-12.0ne

Table des Matières