Installing The Control Panel Remotely; Operation; General; Hot Operation (Hot Mode) - Hatco HCWBI Serie Manuel D'installation Et D'utilisation

Cuves chauffantes/réfrigérantes prêtes à l'installation
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Installing the Control Panel Remotely

Use the following procedure to install the control panel remotely.
WARNING
Control panel must be mounted in a vertical surface.
Mounting control panel in a horizontal surface may result
in the collection of liquids and lead to electric shock.
1. Cut and drill the appropriate holes in the mounting surface.
Refer to the "Control Panel Cutout and Screw Hole
Dimensions" chart for the cutout dimensions.
2. Remove the four trim cover screws from the control panel
and remove the trim cover.
3. Position the control panel into the cutout opening through
the backside.
4. Fasten the control panel to the vertical surface using four
screws (not supplied).

OPERATION

General

Use the appropriate procedure in this section to operate a Hot/
Cold Drop-In Well in either HOT Mode or COLD Mode.
WARNING
Read all safety messages in the Important Safety
Information section before operating this equipment.
NOTE: If the display flashes "OFF" and then the current
temperature, press and hold the
seconds. The display will no longer flash "OFF".
If the display flashes "df" and then the current
temperature, press and hold the
seconds. The display will no longer flash "df".

Hot Operation (HOT Mode)

Use the following procedure to operate the unit in HOT mode.
CAUTION
BURN HAZARD:
• Some exterior surfaces on unit will get hot. Avoid
unnecessary contact with unit.
• Water in holding vessel may reach temperatures in
excess of 190ºF (88ºC). Use appropriate protection
when operating unit.
5. Apply a 1/4" (6 mm) bead of NSF-approved silicone sealant
where the trim cover will contact the cabinet surface. Refer
to the "Control Panel Cutout and Screw Hole Dimensions"
illustration for more information.
6. Reinstall the trim cover on the control panel and secure
in position using the four trim cover screws. Make sure to
embed the trim cover edge into the silicone.
7/16"
(11 mm)
NOTE: Make sure the width of the control panel cutout does
not exceed the above dimension.
1. Install the water baffle into the bottom of the well. Note the
"PROBE" designation on the baffle for proper installation.
2. Install the pan platform(s) into the top of the well. The
number of pan platforms included is determined by the
size of the well.
Pan Platforms
key for three
"PROBE"
Designation
Water Baffle
key for three
Water Level
Preparing the Well for HOT Mode (HCWBI-3DA shown)
10
Silicone Sealant
3/8" (10 mm)
13-1/16"
(332 mm)
13-7/16"
(341 mm)
Control Panel Cutout and Screw Hole Dimensions
Probe
English
1-1/16"
(27 mm)
5-5/8"
(143 mm)
3-1/2"
(89 mm)
Form No. HCWBIM-1017

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Hcwbi-2daHcwbi-3daHcwbi-4daHcwbi-5daHcwbi-6da

Table des Matières