Panasonic U-8ME1E8 Mode D'emploi page 215

Masquer les pouces Voir aussi pour U-8ME1E8:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
Reference diagram for air-discharge chamber (fi eld supply)
Can be installed so that the air direction is to the front, right, left or rear direction.
According to the installation site, you may choose the setting position in the depth direction of the anchor bolt from "A", "B" or "C".
Model : U-18ME1E8, 20ME1E8
Air direction: Front direction
1540
930
1518
35
34
1473
18
Diagram for 22hp ~ 28hp
*b
11
*a
11
748
978
930
703
933
35
34
unit: mm
Air direction: Rear direction
930
34
unit: mm
Air direction: Front direction
For 22hp ~ 28hp
*a
A : 894 (Installation hole pitch)
60
* The tubing is routed out from the front.
B : 730 (Installation hole pitch)
180
* The tubing is routed out from the bottom.
C : 730 (Installation hole pitch)
180
S–5
SUPPLEMENT
Reference diagram for air-discharge chamber (fi eld supply)
Can be installed so that the air direction is to the front, right, left or rear direction.
According to the installation site, you may choose the setting position in the depth direction of the anchor bolt from "A", "B" or "C".
Diagram for 30hp & 32hp
*b
35
11
978
*a
978
18
933
933
Diagram for 34hp & 36hp
*b
11
978
*a
1518
933
1473
*b
1830
1950
1950
Air direction: Front direction
11
930
35
34
A : 894 (Installation hole pitch)
* The tubing is routed out from the front.
B : 730 (Installation hole pitch)
* The tubing is routed out from the bottom.
C : 730 (Installation hole pitch)
Air direction: Front direction
930
35
34
11
18
A : 894 (Installation hole pitch)
* The tubing is routed out from the front.
B : 730 (Installation hole pitch)
* The tubing is routed out from the bottom.
C : 730 (Installation hole pitch)
S–6
unit: mm
For 30hp & 32hp
*a
*b
60
2060
180
2180
180
2180
unit: mm
For 34hp & 36hp
*a
*b
60
2600
180
2720
180
2720

Publicité

Table des Matières
loading

Table des Matières