Power
10
and that the load requires 50 kVAr, the controller will switch on the 1
nd
rd
2
and then 3
st
switch off the 1
finally it will switch the 1
As may be observed, this logic makes it possible to obtain a large
number of steps with a limited number of banks. However, the number
of switching operations is not evenly distributed among the banks,
resulting in greater wear on the first ones.
SEMI-GEOMETRIC LOGIC
It is identified by the code 1:2:2 and the power of the first bank must
be half that of the others, which must all be equal. The first bank is
managed according to a geometric logic whereas all the others, which
have equal powers, are managed according to a linear logic.
IMPORTANT: the first output relay must always be connected to the
capacitor bank with the least power. If the powers of the steps are all
equal, only make sure that the first step is not left without controlled
capacitors. Moreover, in the event that a specific user program is
configured (as in Table 1), the value of the first bank must be set.
10.9 "s:s:s:" = Display of set logic
At the end of an automatic acquisition or manual setting
procedure, the controller will display a switching sequence and
2
20
banks, thereby reaching 70 kVAr. At this point it will
nd
and then the 2
st
back on to reach 50 kVAr.
3
4
40
40
, which will bring it to 40 kVAr, and
5
6
40
80
st
,
71