Instructions For Installing The C.t; Very Important - Ducati Energia REGO 5 Manuel D'instruction

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6) INSTRUCTIONS FOR INSTALLING THE C.T.

The C.T. must have a value:
at the primary winding: equal to or relatively higher than the
maximum current absorbed by the load downstream from the C.T.
itself.
at the secondary winding: 5A.

VERY IMPORTANT:

– The C.T. must be connected both upstream from the power factor
correction system and upstream from the load (See Fig.5 positions
a and b).
– The C.T. must never be directly connected on the load power
supply line (See Fig.5 position c) or directly on the power factor
correction line (See Fig.5 position d).
– In the FF1 connection configuration the C.T. must be connected
to the phase not used for the voltmetric supply to the controller.
If the controller is installed on a DUCATI ENERGIA power factor
correction system the C.T. phase must be L1/R; see Fig.5 position
a and b).
60

Publicité

Table des Matières
loading

Produits Connexes pour Ducati Energia REGO 5

Table des Matières