English
6.2.7. INSTALLING THE FENDERS
Attention: Before proceeding with assembly, you
must remove the rear screws of the front handle.
Then select twelve M6*16 screws, twelve rubber
gaskets and twelve M6 nuts. Start by inserting each
rubber gasket into its corresponding screw, then place
one of the fenders on the corresponding side of the
machine, matching its multiple holes.
To complete the assembly you will have to screw
back the two screws on the front handle that were
previously removed along with the fender as you can
see in the image.
Attention: remember to finish tightening the
plate nut in point 6.2.3. ASSEMBLY OF THE FENDER
FASTENING PLATES AND THE ADJUSTABLE DRAW
6.2.8. ASSEMBLY OF THE BELT COVER
Place the belt cover and tighten the knob.
6.2.9. ASSEMBLY OF THE CUTTERS
Select four M8*45 screws, four M8 nuts, two Ø8*40
pins and two clips
Attention: The cutting edge of the blade must be in
the direction of rotation of the cutters.
Install the double cutters on the inside and the single
cutters on the outside, securing them with the M8
screws and nuts.
Outside, place the plant protection plates fixed with
the M8 screws and nuts.
48/152