Start Up Instructions - Garland Donkey 693 R Manuel D'instructions

Table des Matières
English

6. START UP INSTRUCTIONS

6.1. UNPACKING AND LIST OF MATERIALS
This machine includes the following items that you will
find inside the box:
• Machine.
• Strawberry set.
• Transport wheel.
• Spur.
• Shot.
• Plant protection plates.
• Handlebar.
• Strap cover.
• Gear lever.
• Manual.
• Nose plier
Inspect the product carefully to ensure that there are
no damaged items. If you find any damaged part or
missing element, do not use the machine until the
defect has been repaired or you have all the parts
that make up the machine. Using the machine with
defective parts or without all its elements may cause
severe personal injury.
6.2. MOUNTING
6.2.1. ASSEMBLY OF THE GEARSHIFT
Select the handlebar bracket,
the gear lever two 5*25 bolts
and two 1*1.6*18 clips.
Insert the gear shift lever through the opening of the
handlebar bracket, then rotate it slightly and insert it
into the bolt.ligeramente e insértela en el perno.
Then fix it with the 5*25 bolt and a 1*1.6*18 clip
Next, remove the cardboard covering the gears and
place the handlebar support on the machine, you will
need to place it on the gears of the gearbox.
44/152
Table des Matières
loading

Table des Matières