LaCimbali M26 Utilisation Et Installation page 20

Masquer les pouces Voir aussi pour M26:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

C version / DT version without display
CAREFULLY PAY ATTENTION TO THE
SEQUENCE FOR ACTIVATING THE SWITCHES
(1) AND (1A).
1
1
Press the luminous main switch (1) into position
related indicator light switches on and the key also light up.
If the water level in the boiler is lower than the minimum
limit, the boiler will be lled to the right level, indicated by
restored pressure in the manometer-pump.
During heating, if one of the coffee dispensing push buttons is pressed, the machine dispenses a coffee at the temperature
reached at the time.
Heating is completed when the boiler gauge indicator (19) remains stable in the P green area.
The machine is now ready to dispense coffee, steam and hot water.
To make sure that the dispenser unit and the lter holder (21) are at similar temperatures, press the coffee dispensing push
button (9) and let the machine dispense coffee for a few seconds. Then press again the push button (9) to stop dispensing.
9
2
1A
ONLY AFTER the boiler
the
completed should you press the light switch that
activates the resistance (1A) into position
indicate light switches on and the heating phase begins.
Wait until the operating pressure (approx. 17psi - 1.2 bar)
appears on the manometer (19).
At this point, the machine is ready for use.
12 EN
19
21
1
1A
lling process has been
P
the related

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

997-184-000

Table des Matières