BIANCHI VENDING LEI700 Plus 2Cups Manuel D'emploi Et D'entretien page 20

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 37
4.5.4 Payment system installation
The distributor is supplied without any payment system:
The installation of the payment system is the responsibility of the installation
technician.
Bianchi Industry will not take responsibility for any eventual damage to the
machine itself and/or to things and/or persons due to incorrect installation.
– remove the board and coin mechanism protection door (Fig. 4.24)
– Connect the payment system (Fig.4.25) to the Master board.
The selectors must be directly connected to the Master board the and the serial
executive systems through the interface cable supplied with the machine.
Then go into programming for the correct settings.
Consult chapter" 6.0
SOFTWARE
the parameters, that must be coherent with the system used.
Check the payment system connections, by consulting the diagram of the
sheet shown.
– Hook the coin mechanism (Fig. 4.26).
4.6 Product container loading (with machine off)
4.6.1 Loading containers
The following preliminary operations must be carried out to access the internal
parts of the machine:
– Move lever 1 apart and, keeping it in position, rotate the unit as shown in
figure 4.27.
– Then move lever 2 (Fig. 4.28) in the direction indicated by the arrow and
rotate the unit once more. At this point, you get full access to the internal
parts and can perform the operations regarding the cup columns.
– It is advisable to remove each container when it needs to be filled.
Particularly, for the coffee bean container, it is necessary close the chute
door before removing the container (Fig.4.29).
– remove the covers of each container and load the product according to
the product indicated on the label (Fig.4.30)
– pay attention that they there are no clots, avoid pressing the product
and using an excessive quantity, so as to avoid its aging in relation to the
consumption forseen in the time period between two loadings.
Check the container product capacity in the section TECHNICAL CHARACTE-
RISTICS.
4.6.2 Cup loading
Use only cups suitable for automatic vending machines,
features by consulting the chapter 1.0 "Technical Specifications."), avoid
compressing the cups between
rotate the turret manually.
First filling
In installation phase with the cup dispenser completely empty, operate as
follows:
– Make sure the cup column is not aligned with the dispensing port. Load all
the columns proceeding in anticlockwise direction, and vice versa when the
column is positioned in line with the dispensing port. Close the door and
turn on the machine to allow the cup column to rotate and automatically
move in a position that is in line with the port. Then start loading.
-
Check the cover of the cup column.
Normal filling
The cup column should normally filled with the machine off, simply by ope-
ning the front door, lifting the lid (Fig. 4.31) and inserting the missing cups
(Fig. 4.32).
4.6.3 Spoon loading
Attention! Only use appropriate stirers to be used in automatic vending
machines.
– Remove the metal weight from the spoon dispensing column (Fig. 4.33)
– insert the spoons with their pack wrapping in the column and when they
are positioned on the bottom cut and remove the wrapping (Fig. 4.34)
– once the loading is completed put the weight back in the spoon dispensing
column.
– Check that the spoon are cut burr-free, that they are not bent and that
they are all placed horizontally (Fig.4.35).
4.6.4
Loading the 7th soluble product
-
Move the entire unit forwards (Fig. 4.36).
-
Load the soluble product (Fig. 4.37).
-
Return the unit to the original position and push it until it stops.
-
For any cleaning/maintenance operations, unscrew the ring nut (Fig. 4.38)
and remove the carriage.
Then reposition the carriage and secure it in position with the ring nut.
INSTRUCTIONS" so as to verify setting of
(check the relevant
themselves during the loading. Don't try to
4.6.5 Loading the topping product dispenser (Optional)
– Open the front door using the key provided (Fig. 4.39).
– Lower the door and take a pack of product depletion (Figs.4.40 and 4.41).
– Before inserting the new pack, reset the door by moving the guillotine.
– Insert the new package and close the front door.
4.6.6 Insertion of waste grounds bag
-
Make sure that the liquid collection tank and the coffee grounds tank is
in the correct position (Fig. 4.42) and periodically empty it.
4.7
FIRST SELF INSTALLATION MODE
At the first machine start up will be performed a self installtion .The aim
of this procedure is to avoid the manual connections of wires on the boards
after the filling of the Hydraulic cyrcuit.
For Espresso single boiler:
When the distributor is started up the airbreak is filled with water.
When the floater is in the upper position the machine will start loading water
automatically and this will go on until 200cc of water are counted by the fan
(then water will be supplied via a mixer throughout the procedure).
The procedure will be carried out with resistance off.
At the end a date will be shown on the display.
For Instant boiler :
When the distributor is started up the airbreak is filled with water.
When the floater is in the upper position at least for 5 consecutive seconds the
machine will open an instant electrovalve and start a water loading cycle in
the boiler (then water will be supplied via a mixer throughout the procedure)
The procedure will be carried out with resistance off.
At the end a date will be shown on the display.
Now we must enter the installation date using the push button panel as
shown below:
20
ENGLISH

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hl / 109 dcg k r série

Table des Matières