Table Installation; Wall-Mounted Assembly - Franke FAID100 Notice De Montage Et De Mise En Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 11

10. Table installation

Important!
• Prior to the assembly process, flush the pipework in accordance with DIN 1988.
• Mount the emergency shower in accordance with EN 15154 Part 2.
10.1 Mount the table mounting (a) on the table top (b).
10.2 Connect the eye shower (c) to the seal and the hose (d).
10.3 Insert the hose (d) through the table bracket (a).
Important!
Note the installation position of the filter.
10.4 Insert the filter (f) into the hose (d).
The appropriate water connection (e) for the cap nut G 3/8 must be provided by the
customer.
10.5 Screw the hose (d) to the water supply.
10.6 Check the water connection for leaks.

11. Wall-mounted assembly

Important!
• Prior to the assembly process, flush the pipework in accordance with DIN 1988.
• Mount the emergency shower in accordance with EN 15154 Part 2.
11.1 Mount the wall bracket (b) to the extension (a).
11.2 Mark the drill holes for the wall bracket at a height (c) of 590 mm to 990 mm from the
upper edge of the finished floor.
11.3 Drill holes in accordance with these markings.
11.4 Insert the wall plugs.
11.5 Mount the extension (a).
11.6 Connect the eye shower (d) to the seal and the hose (f).
11.7 Insert the hose (f) into the wall bracket (b).
11.8 The handle bar (e) must face forwards.
Important!
Note the installation position of the filter.
11.9 Insert the filter (h) into the hose (f).
The appropriate water connection (g) for the cap nut G 3/8 must be provided by the
customer.
11.10 Screw the hose (f) to the water supply.
11.11 Check the water connection for leaks.
- 6 -

Publicité

Table des Matières
loading

Table des Matières