Technical Specifications; Scope Of Delivery; Dimensions; Installation Example - Franke FAID100 Notice De Montage Et De Mise En Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 11
6.

Technical specifications

Version:
Connection:
Table feedthrough:
Minimum flow
pressure:
Flow pressure area:
Volumetric flow:
7.

Scope of delivery

FAR-Best.-Nr.
2000101100
2000101101
2000105425
2000101102
8.

Dimensions

9.

Installation example

Hand shower, plastic, green/white, with table
mounting (EPS-coated brass) or plastic wall
mounting, 20° tilted forward,
with stainless steel-coated or spiral water supply
hose,
safety cap with user instructions
Cap nut G 3/8
M 28 × 1.5; length 80 mm; and fastening nut
1 bar
1-4 bar
This area meets the requirements of EN 15154.
6-9 l/min at a flow pressure of 1 bar
Positions
1, 2, 6, x
1, 3, 6, x
1, 3, 4, 6, x
1, 3, 5, 7, x
Pos.
1
Eye shower with safety cap
2
Table mounting with attachment set
3
Wall mounting with attachment set
4
Wall feedthrough
5
Spiral supply hose with filter
6
Connection hose with filter, seal
7
Connection bracket with rosette
x
Sticker with first-aid sign - eye
shower
x
Installation and operating instructions
- 5 -
Name

Publicité

Table des Matières
loading

Table des Matières