Télécharger Imprimer la page

Zodiac Z250 MD3 Notice D'installation Et D'utilisation page 39

Pompe à chaleur

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
1.2 I Hydraulic connections
• The appliance will be connected with a Ø50 PVC pipe, using the half union connectors supplied (see § "5.1 I
Description"), to the pool's filtration circuit, after the filter and before the water treatment.
• Respect the direction of hydraulic connection.
• A by-pass must be installed to make it easier to work on the appliance.
: water inlet valve
: by-pass valve
: water outlet valve
* minimum distance
Connection to a standard filtration circuit
To evacuate the condensates:
• Raise at least 10 cm the appliance with anti-vibration pads,
• Fit the two condensate drainage pipes to the openings located under the appliance base (supplied).
Location for connecting the condensate drainage pipes (seen from below the appliance)
Tip: condensate drainage
• Caution, several litres of water can be drained from your appliance each day. We strongly recommend
connecting the drain to a suitable water drainage system.
: water inlet adjustment valve (optional)
: water outlet adjustment valve (optional)
: water treatment
EN
8

Publicité

loading

Ce manuel est également adapté pour:

Z250 md4Z250 md5Z250 md6