Télécharger Imprimer la page

CAME BKV15AGE Manuel D'installation page 52

Masquer les pouces Voir aussi pour BKV15AGE:

Publicité

Les langues disponibles

Les langues disponibles

Insert the screws supplied in the anchoring plate.
Lock the screws in place with the nuts supplied.
Remove the pre-shaped clamps using a screwdriver.
Fit the anchoring plate in the iron cage.
The tubes must pass through the existing holes.
Position the anchoring plate, taking note of the measurements shown in the drawing.
If the gate does not have a rack, proceed with the installation.
See the section "FASTENING THE RACK".
Cast cement into the foundation frame.
The plate must be perfectly level and the screw threads completely above surface.
Wait at least 24 hours for the cement to dry.
Remove the foundation frame.
Fill the hole with soil around the concrete block.
1
2
76

Publicité

loading