Prepare The Bath With Airjets - Kohler K-1110 Mode D'emploi

Masquer les pouces Voir aussi pour K-1110:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Prepare the Bath with Airjets

For All Installations
Install the drain to the bath according to the drain manufacturer's instructions. Do not connect the
trap at this time.
Position a clean drop cloth or similar material in the bottom of the bath to protect the finish. Ensure
that the airjets are covered. Be careful not to scratch the surface of the bath.
Blower Motor Options
IMPORTANT! The following sections are applicable to either the standard blower installation or the
custom blower installation. Use the "Standard Installation" sections if the blower is to remain on the bath
support board. If the blower is to be relocated to a custom location, use the "Remote Blower Location"
Sections.
Standard Installation Sections
Secure the Bath with Airjets to the Subfloor - Standard Installation
Install the Plumbing - Standard Installation
Make Power Connections - Standard Installation
Test Run the Bath with Airjets - Standard Installation
Then go to the "Complete the Finished Deck" section.
Remote Blower Motor Location Sections
Disconnect the Blower Motor - Remote Blower Location
Secure the Bath with Airjets to the Subfloor - Remote Blower Location
Mount the Blower Motor - Remote Blower Location
Terminate the Cable at the Blower - Remote Blower Location
Install the Power Cord at the Control - Remote Blower Location
Install the Plumbing - Remote Blower Location
Make Power Connections - Remote Blower Location
Test Run the Bath with Airjets - Remote Blower Location
Then go to the "Complete the Finished Deck" section.
1035472-2-E
8
Kohler Co.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-1158K-1375K-1418K-1457K-11343

Table des Matières