Terminate The Cable At The Blower - Remote - Kohler K-1110 Mode D'emploi

Masquer les pouces Voir aussi pour K-1110:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

11. Terminate the Cable at the Blower - Remote

Route the Power Cable
Route two conductors with ground 18 AWG (American Wire Gauge) or equivalent power cable (not
supplied) between the bath and blower motor locations. Follow all applicable electrical and fire
codes. Ensure that the cable jacket meets applicable code requirements and the cable is properly
supported and protected.
Route the Power Cable
Loosen the cable strain-relief nut on the blower motor. Push the nut back on the cable to provide
clearance for the cover removal.
Remove the two access cover screws from the back of the blower motor. As you are loosening the
screws, check periodically if the cover can be slid back on the electrical cable.
When the cover is loose, use electrician pliers or equivalent to cut the electrical cable at a point
about 4" (10.2 cm) from where the cable disappears into the blower motor housing.
Pull the free end of the electrical cord through the cover, insert, and strain relief nut.
Discard the existing strain relief nut and insert.
Reconnect the blower motor plug to the control.
Install a standard NPT threaded strain relief to the blower motor cover.
Temporarily store the removed components in a safe location.
Terminate the New Power Cable at the Blower Motor
At the blower motor 4" (10.2 cm) pigtail lead, strip back the cable jacket about 3" (7.6 cm).
Cut the unused brown conductor off at the cable jacket.
At the newly installed blower motor power cable, strip back the cable jacket about 2" (5 cm).
For installations in the United States, mark any white conductors with red or black tape as required
by the NEC.
Strip the wire insulation about 3/8" (1 cm) from the blower motor pigtail leads and from the power
cable leads.
Route the new power cable leads through the blower motor access cover and strain relief.
Using wire nuts or other approved termination methods, terminate the conductors as follows:
• Connect the brown pigtail lead to the L1 conductor of the power cable.
Kohler Co.
Plug
Remove screws, remove cover
and cut existing cable at about 4"
(10.2 cm) from the blower motor.
Blower Motor
Strain
Relief
Access Cover
17
1035472-2-E

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-1158K-1375K-1418K-1457K-11343

Table des Matières