CAME SALOON Manuel D'installation page 37

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Preparing the site and the turnstile base
Check that there are no dips in ground where you will anchor the turnstile.
Position the anchoring base as shown in the drawing (the leaf is perpendicular to the wall). Mark the anchoring holes
with a pencil.
Note: when installing up against walls, respect the minimum distance of 40 mm.
Leaf
Fit conduits and run the cables through (see the "cable types and minimum thicknesses" table).
Drill the marked spots.
Before anchoring the turnstile to the ground, distribute the electric cables inside the column (see the drawing).
Note: apply the ferrite to the controls / accessories cables.
39
45
Wall
1
2
Ferrite

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

001pssln40

Table des Matières