Electrical Installation; Connection Plan - Lenze E82ZZ B200 Serie Instructions De Montage

Filtre antiparasite
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5

Electrical installation

Important notes
5
Electrical installation
Important notes
ƒ Installation must
– always be in accordance with the operating conditions specified in the Technical
data (21).
– be carried out to EN 60204-1.
ƒ Please observe the following when selecting the cable type:
– The cables used must comply with the approvals required for the application (e. g.
VDE, UL etc.).
– Fuses and cable cross-sections must be dimensioned in accordance with the
specifications in the documentation for the basic device.
ƒ Please observe the following when laying the PE cable:
– The PE connection must comply with EN 61800-5-1.

Connection plan

K1
L1
L2
L3
N
PE
L1
N
PE
8200 vector
K1
L1
L2
L3
N
PE
PE
L1
L2
8200 vector
28
GN/YE
BK
BU
Load
PE
Line
E82ZZxxx
GN/YE
BK
BK
BK
PE
L3
Load
E82ZZxxx xBxxx
F
L1
N
1x
Bxxx
F
L1
L2
L3
Line
3
E82ZZ004
EDK82ZZ113 DE/EN/FR 2.1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

E82zz b210 serieE82zz b220 serie

Table des Matières