Install The Console Box - Berbel Skyline Manuel De Montage

Plaques de plafond abaissables pour les hottes décoratives
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation
3.4.3

Install the console box

The device is designed to be hung on ceilings.
When mounting to a solid ceiling:
☞ Make sure that the ceiling has sufficient load bearing
capacity.
☞ Ensure that the ceiling is level and horizontal.
☞ Use the fastening materials provided.
With different installation situations:
☞ Enquire about alternative fastening systems (e.g. consult
with your architect).
☞ Only use fastening hardware suitable for the type of
ceiling.
=
a Gap between two bolt
anchors
b Gap between two bolt
anchors
☞ Observe the installation dimensions.
D "2.4 Installation dimensions" (page 62).
☞ Determine the hanging position. Observe the hob
position:
y The console box's centre point is directly above the
hob's centre point.
y The console box runs parallel to the hob.
66
a
=
980 mm 1185 mm 1385 mm
347 mm
347 mm
347 mm
D WARNING!
Hazard due to explosions or electric shock!
Drilling through gas, water or electrical lines can lead to
hazardous situations.
☞ Ensure that there are no lines in the wall at the fastening
points.
Ø 8
☞ Determine the locations of the fastening points and mark
them for the bolt anchors.
☞ Drill the holes in the ceiling.
☞ Ensure that only the anchor bolts delivered with the
ceiling lift hood are used.
D "2.3 Scope of delivery" (page 62).
☞ Insert the bolt anchors into the holes.
☞ Ensure that the bolt anchors are tight in the holes.
60
6006237_0 – 21.01.2022

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Skyline edge

Table des Matières