HOLZMANN MASCHINEN BBS810SMART 400V Mode D'emploi page 36

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Carriage Assembly
HOLZMANN Maschinen GmbH
www.holzmann-maschinen.at
the connection plate in the same way
as the base track.
3.1
Placing the machine head
on the mounting support
Lift the machine head out of
the transport packaging and
place it on a stable and clean
surface..
NOTE
2 persons are necessary due
to the weight of the
component. Any
Contamination (particles,..)
could scratch the surfaces.
3.2
Completing the vertical
guide
Insert the 2 vertical posts into
the sliding guides..
3.3
Assemble frame parts
Assemble both vertical frame
parts (right, left-side) onto
the vertical posts using
screw/washer/spring-washer.
ASSEMBLY
36
BBS810SMART_400V

Publicité

Table des Matières
loading

Table des Matières