Preparation; Check Delivery Content; Requirements For The Installation Site; Foundation Plan - HOLZMANN MASCHINEN BBS810SMART 400V Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY
14.1

Preparation

Check delivery content

Check the delivery immediately for transport damage and missing parts. Report any damage or
missing parts to your dealer or the shipping company immediately. Visible transport damage must
also be noted immediately on the delivery note in accordance with the provisions of the warranty,
otherwise the goods are deemed to have been properly accepted.

Requirements for the installation site

For optimizing the function of machine and to achieve maximum cutting precision, it is
recommended to install the machine on a flat concrete area, in a hall or under a shelter. The use of
any other base must be consulted with the producer.
The machine must be installed in a hall or under a shelter. The machine must be protected against
rain.
Recommendation/preconditions:
a) Plan sufficient space for feeding in the work piece, removing the work piece and for
maintenance of the machine.
b) The working area for the saw and them operator must be flat, clean and must not threaten the
operation and activity of the operator.
c) Installation of the lifting equipment for heavy work pieces.
d) Ensure good lighting in the workplace.
For the spatial arrangement of machines keep to all valid standards and hygiene regulations about
the air space in the workplace.
The location of the machines must exclude any threat to the other employees from the operation
in the case of an accident with the tool, ejection of the tooled materials in the case of insufficient
clamping, cutting of the saw band, etc.
The hazardous zone is in the area of 2.5 m from each side of the machine. In the hazardous area
there must not be any unauthorized personnel. In the hazardous zone there must not be any other
items and the ground must be flat to prevent any stumbles.
The whole area of the hazardous zone must be bordered by the fence with the entrance gate. The
fence must have the following parameters:
- mesh with the size of mesh loop 50mm
- total height of the mesh min. 1m
- a distance of 2-3m between columns
- the gate must be fitted with a padlock. The keys from the padlock must only be given to the
service employee and the operator. The fence is not part of the machine and must be constructed
by the machine operator before commissioning the machine!

Foundation plan

The machine does not need a special foundation - only a level and firm concrete floor will do.
The constructed track must be roughly levelled.
HOLZMANN Maschinen GmbH
www.holzmann-maschinen.at
ASSEMBLY
34
BBS810SMART_400V

Publicité

Table des Matières
loading

Table des Matières