Télécharger Imprimer la page

Camp Safety 0284 Mode D'emploi page 7

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
INSTALLING THE REF.0284-028401 ON A STRUCTURAL ANCHOR ELEMENT
It's possible to instal the 0284-028401 directly on the structural anchor element like flat surface (e.g wall) or steel profile. The structural anchor element
to which the 0284-028401 is fastened must have stable construction and have minimal static strength of 14 kN. Construction and fastening of the
structural anchor element must prevent of accidental dissconnection of the 0284-028401.
To instal the 0284-028401 on the structural anchor element we must remove the grip which is designed to be used only for the TRIPOD EVO.
REMOVING THE GRIP
1. Undo four M10 nuts on
the bolts fastened the
grip to the 0284-028401.
INSTALLING ON THE FLAT SURFACE
1. The 0284-028401 should be installed using two (ø10 mm and 10 x
50 mm) wholes situated on the back wall of the 0284-028401.
2. Install the 0284-028401 using two M10 steel or chemical anchor
bolts installed in the way shown on the picture B. Put the
washer M10 (DIN 125A) under each nut. Tighten two
M10 self-locking nuts.
INSTALLING ON THE STEEL PROFILE
1. The 0284-028401 should be installed using two (ø10 mm and 10 x
50 mm) wholes situated on the back wall of the 0284-028401.
2. Install the 0284-028401 using two M10 steel bolts. Put the bolts
through the structural anchor profile and through the
back wall of the 0284-028401. Position of the wholes is shown
on the picture C. Put the washers M10 (DIN 125A) under
the head of each bolt and under each nut. Tighten two
M10 self-locking nuts (DIN 985).
POSITIONING OF THE 0284-028401
1. Check the proper position
of the 0284-028401 and correct
guiding of the rope show
on the pictures D
and E. The construction
element where the 0284-028401
is installed must be vertical
(D) or horizontal (E).
2. Attach the energy
absorber to the cable
using the connector
energy
suppllied with the
absorber
absorber.
M10 bolts
M10 bolts
(DIN 933)
Picture D
2. Remove the bolts.
Remove the grip.
Picture B
M10 bolts
10
Picture C
M10 washers
M10 washers
(DIN125-A)
(DIN125-A)
Picture E
energy
absorber
M10 self-locking
nuts
(DIN985)
M10 washers
(DIN125-A)
10
M10 self-locking
nuts
(DIN985)
3. Connect absorber's
connector to the
attachment
element of a
harness. Use "A"
frontal or dorsal
attachment point
in full body
harness (EN 361)
or rescue
arttachment point
in rescue harness
(EN 1497) or
rescue loops (EN
1498).
EN 3/4

Publicité

loading

Ce manuel est également adapté pour:

028401