Lamps Wiring; Final Adjustments; Power Supply Installation; Lock Release Installation - golmar Stadio Plus T500SE ML Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

DOOR PANEL INSTALLATION
L
amps wiring.
Once the nameplate labels are placed, wire the lamps from different
modules and connect them to terminals L1 and L2 of the sound
module.
If the number of door panel lamps is higher than eight, connect a TF-
104 transformer between ~1 and ~2 terminals of the sound
module and change JP2 jumper position.
NOTE: Don't change JP1 jumper position. JP1 and JP2 jumpers are placed on the left side of the
sound module terminal connector.
If the TF-104 transformer with alternating current lock release is also used, wire ~1/~2
terminals of the sound with CV1/CV2 terminals respectively of the EL500SE module.
F
inal adjustments.
If after starting the system it's considered that the audio
volume isn't correct, proceed with the necessary
adjustments as shown.
The telecamera has a pan and tilt mechanism built in to adjust
the telecamera position.
In case of low light conditions, an external illumination can be
activated by connecting a SAR-12/24 relay between
terminals '+H' and 'L2' of the sound module.
C
lose the door panel.
Fix the door panel by using the supplied
screws.
Finish the door panel assembly by pressing
the closing heads.
117
118
I
nstalling the FA-PLUS and FA-PLUS/C power supplies.
3,5 x 25
DIN-7971
The power supply can be installed on a DIN 46277
guide simply pressing it.
To disassemble the power supply from the DIN guide,
use a plain screwdriver to lever the flange as shown
on the picture.
The FA-Plus/C model uses 6 units over DIN guide and
10 units the FA-Plus model.
IMPORTANT: the maximum number of units that can be connected to a FA-Plus/C power supply is
10, and 50 units in case of a FA-Plus model. Link power supplies to connect more
units than the specified as it's shown on page 132.
Replace the protection cover once the input terminals have been wired.
L
ock release installation.
If the lock release will be installed in a metal door, use a Ø3,5mm.
drill and tap the hole . In case of wood door, use a Ø3mm. drill .
IMPORTANT: the lock release must be of 12Vd.c. or a.c.
See page 132 (a.c. lock releases) and page 133 - 144 (d.c lock releases)

POWER SUPPLY INSTALLATION

The power supply must be installed in a dry and
3,5 x 25
protected place. It's recommended to protect the
DIN-7971
power supply by using a thermo-magnetic circuit
breaker. Use a ground connection with FA-Plus
power supply.
To install the power supply directly on the wall, drill two holes of
Ø6 mm. and insert the wallplugs. Fix the transformer with the
specified screws.
DIN 46277

LOCK RELEASE INSTALLATION

3,5 x 25
DIN-7972
M 4 x 8
DIN-963

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

0111

Table des Matières