B 3)
Install stabilizer 152 and support tube 121.
Drill stabilizer strut at top fastening point (B3 C)
Should you have problems inserting the screws, start with one, and lift the stabilizer to a vertical position before in
serting the second one.
Don't fit the nut of the back screw yet.
If you plan to fold up the stab one day (for loading on a trailer for example), you have to shorten the screws that fit
the stainless steel U bracket and make a chamfer on the tips of leading and trailing edge stab tubes.
-a little positive dihedral is normal.
-the symmetry is absolutely needed.
R A N D K A R s . a . A S S E M B L Y M A N U A L X A I R 2 0 0 6 , J u n e , 0 4
B
C
A
D
B3
C
B 3
M A N U E L D E M O N T A G E X A I R 0 4 J u i n 2 0 0 6
B 3)
Montage de l'empennage horizontal 152 et 121
Ne pas poser l'écrou de la vis de fixation arrière de l'empennage tout de suite.
Percer si besoin le hauban d'empennage pour sa fixation supérieure ( B 3C )
Si vous avez des problèmes pour les vis, mettez la première vis
l'empennage en position verticale pour la deuxième.
Si vous envisager de transporter la machine sur une remorque, l'empennage devra
être replié afin d'être au gabarit routier. Afin de permettre le passage des embouts
de bord d'attaque et bord de fuite de l'empennage lors de cet éventuel pliage, il est
conseillé de chanfreiner légèrement ces tubes et de raccourcir les vis de fixation des
étriers inox.
- Un léger dièdre positif est acceptable
- La symétrie est indispensable
A
B 3
B
B 3