Electric Connections 5; Connecting The Multiple Switch 5.5 - Brink Renovent HR Medium Consignes D'installation

Masquer les pouces Voir aussi pour Renovent HR Medium:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Chapter 5
5.4 Connecting the condensate discharge
The condensate discharge line for the Brink Renovent HR
is fed through the lower panel. The condensate must be di-
scharged through a drainpipe. The drain must discharge under
the water level in the U-trap. The condensate discharge comes
separately with the appliance and the installer must screw it
into the underside of the appliance. This condensate discharge
connection has an external connecting diameter of 20 mm.
5.5 Electric connections
The appliance comes with a 230 V mains plug
5.5.1 Connecting the multiple switch
The multiple switch (not supplied with the appliance) is connec-
ted to the modular connector type RJ12 that is placed at the top
Dependent on the type of multiple switch that is used, a plug
RJ11 or RJ12 can be connected to it.
ses requires an RJ12 plug in combination with a 6-core
modular cable.
10
The condensate discharge line can be glued to it, if necessary
using a square bend. The installer can glue the condensate
discharge in the desired position in the lower part of the ap-
pliance.
See the drawing below for an example of a connection to a
drainpipe.
Pour water into the drip tray to create an air trap
cases requires an RJ11 plug in combination with a 4-core
modular cable.
Refer to the next page for examples of wiring diagrams.
Connector B is a 2-pole screw connector which is used in com-
-
bination with demand-controlled ventilation.
A = Modular connector
B = OpenTherm connector
5730-A
Renovent HR Medium/Large
Installation
5380-0

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Renovent hr large

Table des Matières