Assembling Procedure - L-Acoustics Coaxiale XT Serie Mode D'emploi

Procédures d'accrochage
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

XT
COAXIAL RANGE -
rigging procedures
VERSION 2.0
6.2
Rigging the 12XT or 112P enclosure with the ETR12-2
6.2.1

Assembling procedure

!
All along the assembling procedure, strictly follow the sequence of the successive steps.
WARNING
1.
Fix the ETR12-2 U-bracket to a ceiling, wall, or structure as described in the section 5.2.
Note: Wall-mounting can be performed either in the vertical or horizontal orientation.
!
ALWAYS position the fixed arm on the bottom when wall-mounting the U-bracket in the
vertical orientation.
WARNING
2.
Open the U-bracket's pivoting arm as described
below:
a. Remove the ball locking pin from the pivoting
arm.
b. Pull on the spring-loaded safety and open
the pivoting arm.
3.
Fix the 12XT or 112P enclosure to the U-bracket
as described below:
a. Insert an enclosure's pole socket into the
stud located on the U-bracket's fixed arm.
b. Rotate the pivoting arm back into position:
the spring-loaded safety should lock
automatically.
Verify that the pivoting arm is
!
correctly secured by checking
that it cannot move freely and
that the spring-loaded pin is fully
engaged in locking position.
WARNING
XT-P_RM_ML_2.0
P
SELF-POWERED COAXIAL RANGE
a.
b.
Figure 12: Opening the pivoting arm
b.
Figure 13: Securing the enclosure to the ETR12-2
w w w . l - a c o u s t i c s . c o m
b.
a.
16 en

Publicité

Chapitres

Table des Matières
loading

Table des Matières