Installation Und Inbetriebnahme; Installation Instructions - Ecolab MFV PPFP050 G3/8-G5/8-21 Manuel D'utilisation

Soupape multifonction
Masquer les pouces Voir aussi pour MFV PPFP050 G3/8-G5/8-21:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation und Inbetriebnahme

5
Installation und Inbetriebnahme
5.1

Installation Instructions

Personnel:
1.
Screw the multiple function valve on the pressure connection of the metering pump.
2.
Put the O-ring (Pos. 3) in the O-ring-nut and tighten the union nut (Pos. 4).
3.
Connecting the metering hose.
4.
Cut the hose (Pos. 5) evenly.
5.
Place the union nut (Pos. 6) and the thrust piece (Pos. 7) over the hose up to the
stop collar on the connection nipple (Pos. 8).
6.
Place the o-ring (Pos. 9) in the o-ring-nut and tighten the union nut (Pos. 6).
7.
Also connect the return line.
CAUTION!
The return line (venting line) must always be connected. The multiple
function valve is not an absolute sealing shut-off device.
The minimal cross section must correspond to the valve size
(see
In the case of dosing media which tend to crystallize, the overpressure
function cannot be guaranteed under certain circumstances.
Fig. 1: Installation
3
O-ring
4
Union nut
5
Hose
6
Union nut
417101382 Rev. 07-05.2019
n
Mechanic
n
Service personnel
n
Specialist
Ä Chapter 7 'Troubleshooting' on page 27).
7
Thrust piece
8
Connection nipple
9
O-ring
22

Publicité

Table des Matières
loading

Table des Matières