2
Control Tests
Performing a Control Test
You need the meter, a test strip, and control solution Level 1 or Level 2.
1
Check the use by date on the
test strip container. Do not use
test strips past the use by date.
2
Insert the test strip into the
meter in the direction of the
arrows. Place the meter on a flat
surface.
14
The meter turns on. Preparing
to test appears.
Apply drop appears.