Installation - Burkert 2101 Manuel D'utilisation

Masquer les pouces Voir aussi pour 2101:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2
Air discharge connection
CFA, CFB
Pilot air port
CFI
1
Pilot air port
CFA, CFB, CFI
Release bore
Flats for open-end
wrench
Fig. 13: Installation
Other device versions
Do not remove actuator unless this is a customer-specific
requirement.
Procedure see "Devices with welded body".
Type 2101

Installation

Actuator
Nipple
Valve body
8.3
installation
WarninG!
risk of injury from improper assembly!
Assembly with unsuitable tools or non-observance of the tight-
ening torque is dangerous as the device may be damaged.
▶ For installation use an open-end wrench, never a pipe wrench.
▶ Observe the tightening torque (see "Tab. 5: Tightening torques
of valve body / nipples").
dirt trap for devices with authorization in accordance with din
en 161
In accordance with DIN EN 161 "Automatic shut-off valves for gas
burners and gas appliances" a dirt trap must be connected upstream
of the valve and prevent the insertion of a 1 mm plug gauge.
If the authorisation also applies to stainless steel bodies, the
same type of dirt trap must be attached in front of the globe
valve.
8.3.1 installation of the valve body
Welded bodies
Weld valve body in pipeline system.
Other body versions
Connect body to pipeline.
english
19

Publicité

Table des Matières
loading

Table des Matières