Leister GEOSTAR G5 Instructions D'utilisation page 56

Masquer les pouces Voir aussi pour GEOSTAR G5:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Power supply interruption
Condition of device prior to mains
interruption
Drive and heating are switched on (welding
process).
The drive and heating are switched on
(welding process).
The device is not in the welding process.
Adjusting the track roller height
Before dismantling, it must be ensured that the welding wedge has cooled down, the device has
been switched off with the main switch (2), and the power cord is disconnected from the mains.
The chassis height can be increased or reduced by adjusting the track rollers at the front (18) and rear (12).
A. Undo and remove the cylinder screws (39)
with a socket wrench (wrench size 5 mm).
B. Set the front roller holder (40) and the rear
roller holder (41) to the desired height.
C. Tighten the cylinder screws (39) with a socket
wrench (wrench size 5 mm).
56
Duration of power
supply interruption
≤ 5 sec.
> 5 sec.
39
40
39
Condition of device after mains
interruption
The device continues running without
a restart safeguard with the same set-
tings as before the interruption.
The device starts up and the start
display appears on the display.
The device starts up and the start
-
display appears on the display.
18
39
41
12
39

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Geostar g7

Table des Matières