EdilKamin SALLY Installation, Usage Et Maintenance page 33

Masquer les pouces Voir aussi pour SALLY:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
COVERING INSTALLATION
2) VERSION WITH STEEL SIDES AND CERA-
fig. 10
MIC PROFILES AND TOP
Fig. 10
The stove is delivered (Fig. 1) with the metal side (A-B) and the
E
metal lower/upper front parts (D-E) already mounted.
The pieces indicated below are packaged separately.
B
• 2 horizontal upper/lower ceramic elements
A
(H - Fig. 7 on page 10)
• 1 ceramic top (I - Fig. 9 on page 32)
• 4 milled pins M4
• 4 washers
• 6 rubber pads
D
To fit proceed as follows:
fig. 11
1
2
Fig. 11
4
6
Remove the slotted-in lower front piece (D) and install the two
3
5
ceramic lower/upper horizontal elements (H) as shown in Figu-
re 7-8 on page 10.
Apply the 6 rubber pads provided to the seats on the cast-iron
top and position the ceramic top (I) and the cast-iron grate (L).
Replace the slotted-in lower metal front piece (D).
D
fig. 12
Fig. 12
The figure shows the stove completely assembled.
- 33
-

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sally plus

Table des Matières