Important Instructions - ABB i-bus EIB Mode D'emploi

Masquer les pouces Voir aussi pour i-bus EIB:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39

Important instructions

GB
When planning and erecting electrical systems the
relevant standards and regulations applicable in the
country where the equipment is set up and operated
must be duly observed.
Work on the 230V-mains system and EIB bus must
exclusively be performed by trained electrical
personnel. Laying and connection of the bus line as
well as application devices must be in conformity
with applicable guidelines specified in the EIB Manu-
al of the European Installation Bus Association (EIBA).
Please note that the UP watchdogs are not meant
to function as burglary or invasion alarm systems
since they are not adequately protected against
acts of sabotage as prescribed.
Please make sure the ambient conditions suited for
the safety class and permissible operating tempe-
rature (see "Technical Data") are met.
When mounting the UP watchdog 180 use a suitable
®
UP bus coupler (ABB ibus
EIB) or UP mains coupler
®
(ABB Powernet
EIB) – hereinafter collectively termed
UP coupler.
The devices are to be programmed using ETS2
(version 1.1 or higher) or via Power-Project (Version
3.0 or higher).

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

6132-24-102-5006132-24-102m-5006122-84-500

Table des Matières