Mounting / Dismantling - ABB i-bus EIB Mode D'emploi

Masquer les pouces Voir aussi pour i-bus EIB:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39

Mounting / Dismantling

Before mounting the UP watchdog, correctly arrange a
UP coupler (see Fig. 1, Item 8) in location suitable for
the UP watchdog.
• Position the UP watchdog so as to be ready for
mounting.
• Fix the covering frame (fig.1, item 5) in mounting
position (the frame is held in position by the mounted
controller).
• Mount the UP watchdog (fig.1, item 1) onto the
flush-mounted UP coupler (fig.1, item 8) in such a
way that
– the rear 10-pole plug connector (fig.1, item 3) is
not canted;
– the fixing clips (fig.1, item 4) on the back of the
unitengage with the recesses (fig.1, item 7)
provided in the carrying ring of the UP coupler.
• Engage the UP watchdog in the carrier ring of the UP
coupler.
Dismantling: Lever the UP watchdog (Fig. 1, Item 1)
together with covering frame (Fig. 1, Item 5) off the UP
coupler's carrier ring. Take care that the plug connector
(Fig. 1, Item 3) will not cant!
GB

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

6132-24-102-5006132-24-102m-5006122-84-500

Table des Matières