Ingersoll Rand ENL 2 Instructions De Montage Et De Service page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
14
Installation of the control unit on the service unit:
1.
2.
.
4.
.
Start-up subsequent to maintenance measures:
Always carry out prior to the start-up:
ingersollrandproducts.com
Check whether or not the service unit () goes with
the control unit (1) (model designation and color of
the arresting hook).
Check whether or not the sealing mat (11) and the
contact springs (1) are clean, dry, and free from
impurities.
Introduce the sensor (12) into the sensor tube plate
(14).
Hang the hook (1) of the control unit (1) in the
sensor tube plate (14).
Press the control unit (1) against the service unit ()
and snap into place.
Leak test of the screwed connector
Check of the electrical connections
Check of the correct engagement of the control unit
80442866

Publicité

Table des Matières
loading

Table des Matières