Before Installation - Noritz NR71-SV Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.

Before Installation

Checkup
• Check the fixing brackets and vent pipe yearly for damage or wear. Replace if necessary.
Check the Gas
• Check that the rating plate indicates the
correct type of gas.
• Check that the gas supply line is sized for
180,000 Btuh for NR71-SV, NR71-OD.
(140,000 Btuh for NR66-SV, NR66-OD.)
Check the Power
• The power supply required is 120VAC, at 60Hz.
May result in fire or electric shock.
Use Extreme Caution if Using With a Solar Pre-Heater
• Using this unit with a solar pre-heater can lead to unpredictable output temperatures and
possibly scalding. If absolutely necessary, use mixing valves to ensure output temperatures do
not get to scalding levels.
Do Not Use Equipment for Purposes Other Than Those Specified
• Do not use for other than increasing the temperature of the water supply, as unexpected accidents
may occur as a result.
Check Water Supply Quality
• If the water supply is in excess of 12 grains per gallon (200 mg/L) of hardness, acidic or otherwise
impure, treat the water with approved methods in order to ensure full warranty coverage.
DANGER
WARNING
Ex. For Natural Gas NR71-SV
NR71-SV
180,000 BTU
25,000 BTU
CAUTION
177
670
4.0
10.5
0.55
2.25
15
150
2
3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Nr66-svNr71-odNr66-od

Table des Matières