Commissioning, Operation; Mounting Preparation - WIKA RLS-7000 Mode D'emploi

Détecteur de niveau à flotteur oem, version miniature
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Transport ... / 5. Commissioning, operation
4.2 Packaging and storage
Do not remove packaging until just before commissioning.
Permissible conditions at the place of storage:
Storage temperature: -25 ... +80 °C (-13 ... +176 °F)

5. Commissioning, operation

Observe all instructions given on the shipment packaging for
removing the transportation safety devices.
Remove the float switch carefully from the packaging!
When unpacking, check all components for any external damage.

5.1 Mounting preparation

Functional check
Before mounting, the float switch can be connected as
described in chapter 5.3 and the switch points can be
operated manually.
WARNING!
Physical injuries and damage to equipment
A fault with the electrical functional check can lead to a
malfunction in the plant and thus lead to injury to personnel
or damage to equipment.
Ensure that the functional check does not start any
unintended processes.
Do not carry out a functional check during operation or
when actively controlling.
Ensure that the sealing faces of the vessel or float switch are clean and
do not show any mechanical damage.
WIKA operating instructions models RLS-7000, RLS-8000
EN
11