SWM RS 650 R 2016 Manuel - Utilisation - Entretien page 102

Masquer les pouces Voir aussi pour RS 650 R 2016:
Table des Matières
Les langues disponibles
  • FR

Les langues disponibles

BRAKE HYDRAULIC SYSTEM BLEEDING
It is very important to do this at the intervals stated
on the "Scheduled Maintenance Chart". Carry out
the operation even if the lever or the control pedal
free play increases.
RS
RS
EN - 44
WARNING*:
Periodically check the connecting hoses (see
"Scheduled Maintenance Chart"): if the hoses (A)
and (B) are worn or cracked, their replacement
is advised.
SM
SM
A
B
Table des Matières
loading

Ce manuel est également adapté pour:

Sm 650 r 2016

Table des Matières