Refrigerant Scale Screw; Release; Commissioning; Connections - MAHLE ACX150 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

improper
means/protections
without complying with the existing
laws on manual handling of loads and
with the operations described in this
manual.
 Cut the strap and remove the carton.
 Cut the straps securing the unit to the
pallet.
 Remove the equipment from the
pallet (2 operators required)
 Lift both front
wheels
by
levering with the
handle
and
on
rear wheels (this
way the operators
must not lift the
full weight of the
unit)
 Keep the pallet, carton and scratch
protection film for use when returning the
unit. The unit rolls on wheels; the two
smaller wheels can be locked.
ACX150/250
is
accumulation tank empty. This prevents
problems in shipping the unit.
and
 Slowly
lower
the unit from the
pallet by means
of the rear wheels
supplied
with
EN | 16 | ACX150/250 | Commissioning

REFRIGERANT SCALE SCREW

The tool is transported, with the scale
blocked by a locking screw to avoid the
load cell damage. The scales locking
screw is placed on the equipment
bottom/right side (see the box shown
above) and is formed by a bolt. For
commissioning, unscrew the screws.

8 Commissioning

8.1

Connections

The unit has to be positioned on a
horizontal surface to ensure the correct
operation.
the
The unit has to be connected to the
electric mains following instructions on
the identification plate of the unit applied
next to the main switch, mainly as to
applicable voltage and power.

RELEASE

© MAHLE

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Acx250

Table des Matières