Installation; Electrical Installation - Dometic SKYSOL POWERED ROOFBLIND Instructions De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45

Installation

• SO: Single-ended, frame open at one end with one fabric, full travel
The number on the product label in the head rail indicates the blind type.
7
Installation
!
WARNING! Risk of injury
Disconnect the power supply before you begin and ensure that it can not be
reconnected until installation has been completed.
7.1

Electrical installation

A
NOTICE! Risk of damage
• Ensure cables are not damaged during installation.
• Ensure that a 12 V or 24 V stabilised power supply line is available for the
drive (rated power 13.2 W) at the point of installation.
• Ensure that the power supply line is suitably arranged and protected.
• Ensure that routings of cables through walls or bulkheads are protected
and insulated by appropriate bushing, grommets or cable conduits.
• Secure all cables to prevent any contact with moving parts.
Proceed as follows:
➤ Decide on the routing of the motor wire (fig. 2, page 3). Each head rail has
a separate cable (except for S1 or SO blind types).
➤ Check the voltage of the blind (see cable label).
➤ Choose a location for the control device (such as switch or remote control)
which must be installed in a visible location.
➤ Connect the blind according to the circuit diagram:
– Manually switched blinds (fig. 7, page 6)
– Remotely controlled blinds (fig. 8, page 6)
– Other control system (fig. 9, page 7)
I
NOTE
Momentary operation of the switch or automation system for 500 ms will
instruct the Somfy Centralis DC IB control unit to apply power to the blind
motor in the direction selected for a maximum of 3 min. To stop the Somfy
Centralis DC IB control unit press the centre stop button.
22
Powered Roofblind
EN

Publicité

Table des Matières
loading

Table des Matières