Ferroli OPERA Instructions D'utilisation, D'installation Et D'entretien page 159

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERA
Connection
Before making the flue connection fill the condensate trap with approx. 0.5 liters of
B
water through the flue connections.
To calculate the maximum length of the fume ducts, refer to the maximum available head indicated in table 5.
Table 5 - Maximum flue pipe length
Maximum flue head
EN
fig. 55- Fume outlet
Model
Model
"70"
"125"
Ø 80
Ø 100
200 Pa
200 Pa
cod. 3541R960 - Rev. 00 - 09/2019
Model
Model
"220"
"320"
Ø 160
Ø 200
200 Pa
200 Pa
159

Publicité

Table des Matières
loading

Table des Matières