Figure 7. Power Pack Installation - Zodiac Nature2 Fusion Soft Manuel D'installation Et De Fonctionnement

Le générateur de chlore
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Page 16
ENGLISH
3.7
Installing the FUSIONM or AquaLink
RS PureLink
TM
CAUTION
The power center is required to have the appropriate
means of disconnection, circuit isolation, and/or
branch circuit protection installed upstream of the
power center.
NOTE The control/power center should be located at
or near the equipment pad.
1.
Locate the control/power center at least 1.52 m (5
ft) or more away from pool/spa and 1.52 m (5 ft)
off the ground. All national, state, and local codes
are applicable.
2.
The control/power center comes with two (2) full
length, heavy duty mounting brackets fastened
to the back of the power center during shipping.
Remove the four (4) screws that are holding the
two (2) brackets and the cardboard shipping cover
in place (see Figure 7). Remove and discard the
cardboard.
3.
Using the top mounting bracket as a guide, mark
three (3) holes on the mounting surface where the
power center will be installed. Drill the holes in
the mounting surface.
NOTE The three (3) mounting holes are 10 cm (4")
apart center to center.
Screws (4)
Figure 7.
Power Pack Installation
Zodiac
Nature
Fusion Soft
®
®
NOTE Use heavy-weight screws. The power center
4.
5.
NOTE As with the top brackets, the bottom bracket
6.
7.
8.
(10 cm)
(10 cm)
4"
4"
Mark holes on mounting surface
|
Installation and Operation Manual
with all available components installed weighs
approximately 30 pounds.
Reinstall the mounting brackets to the top and
bottom of the back of the control/power center
using the four (4) screws that were removed in
Step 2. Ensure that the brackets are rotated from
the original shipping position.
Hang the power pack on the surface using the
three (3) holes drilled in Step 3. With the control/
power center in place, mark three (3) holes for the
bottom bracket mounting.
requires three (3) mounting holes. The three (3)
mounting holes are 10 cm (4") apart center to
center.
Drill the holes and install the screws.
Level the control/power center and tighten all
screws, ensuring that the control/power center is
securely fastened to the mounting surface.
Check source voltage. (All units are factory wired
In order to use on 120 VAC, the
for 240 VAC).
internal factory wiring of the power center
must be changed. (See Figures 10 and 12).
Mounting Brackets (2)
Control/Power Center

Publicité

Chapitres

Table des Matières
loading

Table des Matières