Removal From Service; Maintenance And Cleaning - Abicor Binzel MB 14 AK Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7 Removal from service

7 Removal from service

8 Maintenance and cleaning

EN - 10
NOTE
• Liquid-cooled hose assemblies may start leaking if overheated. This is
why the cooling unit should continue running for approx. 5 min. after
welding.
1 Welding is stopped.
2 Wait until the shielding gas flow has subsided and switch off power supply.
3 Close the valve of the shielding gas cylinder.
DANGER
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair
work, the following instructions must be adhered to:
• Switch off the power supply and close off the gas supply.
• Close off the compressed-air and pull the mains plug.
1 Unscrew the hose assembly on the machine side and bring it into a
stretched position.
2 Unscrew liner retention nut and pull out wire spiral liner or PA liner and
replace it, if necessary.
3 Remove worn parts from the torch neck.
WARNING
Risk of injury
Serious injuries caused by parts swirling around.
• When cleaning the spiral wire with compressed air, wear suitable
protective clothing, in particular safety goggles.
4 Clean wire cable feed hose from both sides with compressed air.
5 Mount spiral wire liner or PA liner and secure it with nut.
6 Connect cable hose assembly on the machine side with retention nut.
MB/RAB

Publicité

Table des Matières
loading

Table des Matières