Vetus BOW2512E Manuel D'utilisation Et Instructions D'installation page 13

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
4.3
Final assembly
• Grease the propeller shaft with 'outboard gear grease' and install
the propeller.
The propeller should run a minimum of 1.5 mm (
thrust tube wall, all round.
• Slide the flexible coupling onto the output spindle of the electric
motor as far as necessary to allow the end of the output spindle
(A) and the underside of the flange (B) to become aligned.
• Tighten the lock-screw (C).
• Grease the input shaft with an installation compound, like 'Mo-
lykote® G-n plus' .
• Grease the threads of the fastenings bolts with 'outboard gear
grease' and install the electric motor to the intermediate flange.
• For a first check, turn the propeller by hand, it should turn easily,
whilst being connected to the output spindle of the electric mo-
tor.
vetus® Operation manual and installation instructions bow thruster BOW2512E
1
/
") free of the
16
Outboard Gear
Grease
M6
5 - 6 Nm
(3.7 - 4.4 ft.lbf )
M5
3 Nm
(2.2 ft.lbf )
M8
12 - 15 Nm
(9 - 11 ft.lbf )
Outboard Gear
Grease
Molykote® G-n plus
ENGLISH
5
2.5
6
13
020530.07

Publicité

Table des Matières
loading

Table des Matières