Mounting Requirements - ero electronic TMS Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MOUNTING REQUIREMENTS

MOUNTING REQUIREMENTS
MOUNTING REQUIREMENTS
MOUNTING REQUIREMENTS
MOUNTING REQUIREMENTS
Select a mounting location having the following
characteristics:
1) it should be easy accessible also on the rear
side.
2) there is no vibrations or impact
3) there are no corrosive gases (sulphuric gas,
ammonia, etc.).
4) there are no water or other fluid (i.e. condense)
5) the ambient temperature is in accordance with
the operative temperature of the instrument
(from 0 to 50 °C).
6) the relative humidity is in accordance with the
instrument specifications ( 20% to 85 % non
condensing).
The instrument can be mounted on a panel up to
15 mm thick with a square cutout of 45 x 92 mm.
For outline and cutout dimensions refer to Fig. 2.
The surface texture of the panel must be better
than 6,3 µmm.
The instrument is shipped with rubber panel
gasket (50 to 60 Sh).
To assure the IP65 and NEMA 4 protection, insert
the panel gasket between the instrument and the
panel as shown in fig. 1.
While holding the instrument against the panel
proceed as follows:
1) insert the instrument through the panel gasket,
2) insert the instrument, with the panel gasket,
through the panel cut out,
3) while pressing the instrument firmly against the
panel, insert the mounting bracket and slide it
up to the end of the case,
4) with a screwdriver, turn the screws with a
torque between 0.3 and 0.4 Nm,
5) Make sure you cannot move the case within
the cut out otherwise you do not have a NEMA
4X/IP65 protection.
screw
bracket
screw
gasket
Fig. 1
GB
GB
GB
GB
GB
1
panel

Publicité

Table des Matières
loading

Table des Matières