Installation Of The Effective Load - Festo EGC-TB-KF Notice D'utilisation

Masquer les pouces Voir aussi pour EGC-TB-KF:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 57
EGC-TB-KF, EGC-HD-TB
5.1.2

Installation of the effective load

• Place the effective load so that the tilting torque resulting from
force F (parallel to the axis of motion) and lever arm "a" remains
low.
• Fasten the effective load to the slide with the screws and cent­
ring sleeves.
• Make sure that the maximum screw-in depth D is adhered to.
Size
Screw (side/top)
Max. screw-in depth D
Centring (H7)
Tightening torque
Tab. 3
Effective loads with own guide:
• Adjust the guides of the effective load and of the EGC so that they are exactly parallel.
You will then avoid overloading the guide and increased wear.
With hard and stiff effective loads (e.g. steel):
Note
If the aluminium slide becomes bent against a curved
effective load, the service life of the guide will be re­
duced.
• Make sure that the mounting surface of the
effective loads is even to within t = 0.01 mm.
If additional slides are used, possible differences in
height must be compensated for.
Effective loads projecting in the longitudinal direction of the slide:
• Make sure that the effective load does not strike against the
motor.
Festo – EGC-TB-KF, EGC-HD-TB – 1505b English
50
70
M4
M5
[mm]
4.2
8.4
5
5
[mm]
[Nm]
2.9
5.9
a
Fig. 6
Fig. 7
80
120
125
M5/M6
M5
9.5
10
8.4
7/9
5/9
5.9/9.9
5.9
Fig. 8
Fig. 9
F
160
185
220
M6
M6/M8
M6
9.5
15
10
9
9
9
9.9
9.9/24
9.9
t
27

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Egc-hd-tb

Table des Matières