Fit the manifold support flanges "5" using the special holes provided on the top of the modules. The starting
bracket on the first module must respect the distance of 45 mm. (see box "G" fig. 35). This distance must be
increased by 5 at a time in the following modules, in order to obtain the fume manifold angle as indicated in
fig. 32. Fit the condensate trap "6" support bracket on the flange of the first module.
H
Insert the 90° M-F bends "8" on the pipe sections "7", positioning them at 45° with respect to the module (see
box "H" fig. 35). When installing a module Reply 51/i use only one 90° bend and the cap contained in the
starting kit.
L
Fit the flue pipes together (operation to be carried out on the ground) , ensuring the alignment of the various
connections "9" and respecting the coupling measurement of 705 mm (see box "L" fig. 36).
M
Place the manifolds connected together on the support flanges and gradually insert all the bends on the pre-
viously fitted diameter 100 pipe sections.
Check the correct angle of the manifold (see fig. 32) and the correct fitting of all the pipe sections, bends and
valves, making sure the seals are properly fitted (see box "M" fig. 36). Make the external seals adhere to the
top of the modules. Tighten and fix the support flanges.
N
Fit the manifold closing cap "10". Insert the condensate trap "11" and fix it to the special bracket "6" fitted in
point "G". Connect the trap outlet to a condensate collection point (e.g. the condensate manifold of the mod-
ules).
A
Use a special lubricant to facilitate the manifold connections.
76
fig. 35
fig. 36
cod. 3540H322 - 09/2008 (Rev. 01)