Commissioning - Stiebel Eltron DHE Connect 18 Utilisation Et Installation

Masquer les pouces Voir aussi pour DHE Connect 18:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 113
INSTALLATION

Commissioning

f Align the mounted appliance by undoing the fixing toggle,
f
aligning the power supply and back panel, and then re-tight-
ening the fixing toggle. If the back panel does not sit flush
against the wall, you can secure the appliance at the bottom
with an additional screw.
Material losses
!
The cover plate of the lower back panel section must not
bend when installed.
11.1 Installing the mini wireless remote control
You can attach the mini wireless remote control to the wall using
the wall retainer.
f Secure the wall retainer to the wall using the adhesive pad
f
provided or a suitable countersunk screw (∅ 3 mm or less).
www.stiebel-eltron.com 
12. Commissioning
12.1 Initial start-up
f Open and close all connected draw-off valves several times,
f
until all air has been purged from the pipework and the
appliance.
f Carry out a tightness check.
f
f Activate the safety switch by firmly pressing the reset button
f
(the appliance is delivered with the safety switch disabled).
In the DHE Connect 18/21/24 and DHE Touch 18/21/24 appliances,
the medium connected load (21 kW) is factory preset.
DHE Connect | DHE Touch |
≥ 60 s
89